First, these power plants are subject to subsidy schemes in Hungary as well. Second, with the reduction of investment costs, establishment on a market basis should also be considered, in particular coupled with the need for large-scale industrial electricity demand.
However, an establishment has a lot of issues. Please find on our webpage a regulatory overview of necessary licensing, authorization, network and transmission system contracting and public administrative steps of a photovoltaic power plant, as well a chart of the DSO connecting and a summary on the elements of a feasibility study. Please also find a summary on taxation issues from a foreign company’s viewpoint. Finally, we also enclosed an alert summary on the recently issued pilot tender for subsidized power generation.
With our constant experiences and outstanding references we are ready to assist you through all these steps, issues and even well beyond:
Egyrészt ezek az erőművek Magyarországon külön pénzügyi támogatást élveznek. Másrészt a beruházási költségek csökkenésével, már piaci alapon is megfontolandó a megújuló erőművek létesítése, különösen nagyipari villamosenergia-felhasználási igénnyel párosítva.
A létesítés azonban számos feladattal jár. A weboldalunkon elérhető a naperőművek szabályozási összefoglalója, amely tartalmazza a szükséges engedélyezési-, jóváhagyási-, hálózati-, átviteli szerződéses és közigazgatási teendőket, továbbá az elosztóhálózati csatlakozást bemutató ábra és egy összefoglaló a megvalósíthatósági tanulmány elemeiről. Szintén elérhető külön összefoglaló az adózási kérdésekről, elősorban külföldi társaság szemszögéből. Végül szintén elérhetővé tettünk egy összefoglalót a legújabban kiírt, támogatott villamosenergia-termelésre irányuló pilot tenderről.
A konstans tapasztalatunkkal és kiemelkedő referenciáinkkal szívesen működünk közre ezen lépések és problémák megoldásában, és azokon túl is: